Approval of Building Plans

 Approval of building plans.




No automatic alt text available.


Qualifications :-


Submission of building plans drawn up in accordance with the regulations of the Urban Development Authority.


1. The relevant land should have been approved by the Pradeshiya Sabha / Urban Council for the proposed development.

2. A copy of the approved design plan should be submitted.

3.Presenting plan front view, side view, cross section, field plan, development title,


4. The foundation should have a cross section.

5.Plans submitted in accordance with the regulations of the Urban Development Authority and in the relevant scales


Having prepared with.

6. Certified by a qualified person.



Process of Submitting Applications Places From Where Applications can be Obtained: - Divisional / Urban Council Building Division.


Fees Payable for Obtaining Application: - -Rs: 200.0012% VAT: Rs. 24.00



Hours for Submitting Application: Office hours 9.00 pm 12.30 pm - pm 1.00 pm To 3.00 p.m.



Fees Payable for Obtaining the Service: - (Advance Fee)


Time Taken to Provide the Service (Ordinary Service and Priority Service): - Between 02 or 08 weeks


Supporting Documents Required: -

  

1. Resident-


* A copy of the plot plan approved by the local / municipal council

* 03 copies of building plans drawn according to the scales and measurements mentioned in the application

A copy of the deed.

* A copy of the assessment tax receipt paid in the name of the applicant.

* Building application and plan must be approved by a Chartered Architect when exceeding 3000 square feet.

* In case of a blind wall, the recommendation of a structural engineer should be obtained.

           

 2. Commerce and Industry.


* A copy of the plot plan approved for commercial or industrial use by the local / municipal council.

* 03 copies of building plans drawn according to the scales and measurements mentioned in the application

A copy of the deed.

* A copy of the assessment tax receipt paid in the name of the applicant.

* Building application by a Chartered Architect in excess of 3000 sq. Ft

The plan must be approved.

* In case of a blind wall, the recommendation of a structural engineer should be obtained.

* Recommendation of the Fire Service Department.

* For industrial use, a basic design settlement application must be submitted.


                                      

Exceptions or Instances Outside the Above Requirements and Special Information: Regarding the parcels of land which were first allotted on 10.03.1986 with effect from the Regulations of the Urban Development Authority.


PS: None of this is going to work if T O is not given Something ekak.